Countach QV #GLA12997

installing the heads with the new gaskets

Meanwhile both heads are fixed on the block, soon the final tightening with 100Nm is done.
Still many little things are to be done, like installing the checker starter, changing the oil hoses and and and. Finally timing adjustment will be done and then the external things like water pump, distributor and so on installed.

The new gaskets are from german gasket specialist Victor Reinz and far better than the old ones, the fire ring for example is much wider, also the silicone inlayers are done perfectly

.The red silicone you can see on the engine will be cleaned later, you will not find traces any longer once the engine is completed.

-> Back to Head-Page

-> Back to Head-Page

© Copyright www.countach.ch, E-mail: info@countach.ch